What are the requirements for installing a pump station?
A pump station must be installed on a stable, level base with compliant inlet and discharge pipework, safe access for maintenance, proper ventilation, and licensed electrical connection for the pump and alarm system.
Polymaster stations simplify installation because the chambers are lightweight, self-anchoring (no concrete required), and pre-assembled with valves, fittings, a brass discharge outlet, and a high-level alarm. Qualified installers only need to connect plumbing and power, set inlet heights, and ensure local regulations are met.
